Mfg Part Number: CK-104 LONG LEAD
Alternate P/N: CK104LONGLEAD
NSN : 5910-00-113-5499
NIIN : 001135499
CAGE Code : 71590
Manufacturer: Crl Components Inc
Item Name : Capacitor Fixed Ceramic Dielectr
FSC : FSC 5910 Capacitors
Thank you for your interest in our available parts and components on NSN Target. Capacitor Fixed Ceramic Dielectr is an item listed with the part number CK-104 LONG LEAD, and it is manufactured by Crl Components Inc. This particular item CK-104 LONG LEAD is currently available for purchase through our website today, and our team of industry experts are on standby 24/7x365 to provide rapid lead-times and competitive pricing. To begin the purchasing process, we invite you to fill out and submit an Instant RFQ form as provided through our website. Once received, a member of our staff will reach out to you in 15 minutes or less to provide a quote that has been personalized to fit your individual needs.
NSN Parts is a website that is owned and operated by ASAP Semiconductor, and we serve as a leading independent distributor of NSN parts and components that serve many industries and applications. Throughout our extensive part and manufacturer catalogues, we carry a variety of top requested components that you may need, including CK-104 LONG LEAD with NSN 5910001135499 and other parts manufactured by Crl Components Inc. Quality is of the utmost importance to us at NSN Parts, and we have established ourselves as an FAA AC 00-56B, AS9120B, and ISO 9001:2015 certified enterprise. Get started today with a personalized quote and experience how we are revolutionizing the parts procurement process.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Ceramic Dielectr | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Ck-104 Long Lead | B | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”. |
We Hope that You Will Visit Us Again the Next Time You Need NSN Parts and Make Us Your Strategic Purchasing Partner.
Request for Quote